Your Vehicle: 2009 Nissan-Datsun Altima V6-3.5L (VQ35DE)
 
Vehicle » Windows and Glass » Windows » Testing and Inspection » Programming and Relearning » Power Supply And Ground Circuit » Front Power Window Switch  
 
 
  Front Power Window Switch  
 

POWER SUPPLY AND GROUND CIRCUIT

FRONT POWER WINDOW SWITCH : Special Repair Requirement

  1. PERFORM INITIALIZATION PROCEDURE Perform initialization procedure. Refer to See: Additional Service When Replacing Control Unit\Special Repair Requirement\LH & RH Front Anti-Pinch-Sedan.

Is the Inspection result normal?
YES >> GO TO 2
NO >> Check intermittent incident. Refer to See: Testing and Inspection\Initial Inspection and Diagnostic Overview\Service Information For Electrical Incident\Intermittent Incident.
CHECK ANTI-PINCH OPERATION
Check anti-pinch operation. Refer to See: Additional Service When Replacing Control Unit\Special Repair Requirement\LH & RH Front Anti-Pinch-Sedan.
Is the Inspection result normal?
YES >> Inspection end.
NO >> Refer to See: Component Tests and General Diagnostics\Encoder\Passenger Side\Component Function Check\LH & RH Front Anti-Pinch-Sedan.