Your Vehicle: 2009 Nissan-Datsun Altima V6-3.5L (VQ35DE)
 
Vehicle » Starting and Charging » Charging System » Testing and Inspection » Initial Inspection and Diagnostic Overview » Charging System Preliminary Inspection  
 
 
  Charging System Preliminary Inspection  
 

CHARGING SYSTEM PRELIMINARY Inspection

Inspection Procedure

1.CHECK BATTERY TERMINALS CONNECTION
Check if battery terminals are clean and tight.
Is the Inspection result normal?
YES >> GO TO 2
NO >> Repair battery terminals connection.
2.CHECK FUSE
Check for blown fuse and fusible link.

  

Is the Inspection result normal?
YES >> GO TO 3
NO >> Be sure to eliminate cause of malfunction before installing new fuse or fusible link.
3.CHECK GENERATOR GROUND TERMINAL CONNECTION
Check if connector E230 terminal 5 (generator ground harness) is clean and tight.
Is the Inspection result normal?
YES >> GO TO 4
NO >> Repair connection.
4.CHECK DRIVE BELT TENSION
Check drive belt tension. Refer to See: Alternator\Service and Repair\Inspection.
Is the Inspection result normal?
YES >> Inspection End.
NO >> Repair as needed.