Your Vehicle: 2009 Nissan-Datsun Altima V6-3.5L (VQ35DE)
 
Vehicle » A L L Diagnostic Trouble Codes ( DTC ) » Testing and Inspection » P Code Charts » P0705 » CVT RE0F10A  
 
 
  CVT RE0F10A  
 

P0705 PARK/NEUTRAL POSITION SWITCH

Description

  • The PNP switch assembly includes a transaxle range switch.
  • The transaxle range switch detects the selector lever position and sends a signal to the TCM.

DTC Logic

DTC DETECTION LOGIC

  

DTC CONFIRMATION PROCEDURE

CAUTION:
Always drive vehicle at a safe speed.

NOTE:
If "DTC CONFIRMATION PROCEDURE" has been previously performed, always turn ignition switch OFF.
Then wait at least 10 seconds before performing the next test.
1.CHECK DTC DETECTION
With CONSULT-III

  1. Turn ignition switch ON.
  2. Select "DATA MONITOR".
  3. Start engine.
  4. Drive vehicle and maintain the following conditions for at least 2 consecutive seconds.

  

With GST
Follow the procedure "With CONSULT-III".
Is "P0705 PNP SW/CIRC" detected?
YES >> Go to Diagnosis Procedure.
NO >> Check intermittent incident. Refer to See: Testing and Inspection\Initial Inspection and Diagnostic Overview\Service Information For Electrical Incident\Intermittent Incident.

Diagnosis Procedure
1.CHECK POWER SOURCE

  

  1. Turn ignition switch OFF.
  2. Disconnect PNP switch connector.
  3. Turn ignition switch ON.
  4. Check voltage between PNP switch harness connector F25 terminal 3 and ground.

  

Is the Inspection result normal?
YES >> GO TO 2.
NO >> Check the following.

  • Harness for short or open between ignition switch and PNP switch
  • 10A fuse (No. 4, located in fuse block)
  • Ignition switch 2.CHECK HARNESS BETWEEN TCM AND PNP SWITCH (PART 1)

  

  1. Turn ignition switch OFF.
  2. Disconnect TCM connector.
  3. Check continuity between TCM harness connector F16 (A) terminal 1, 2, 3, 4, 11 and PNP switch harness connector F25 (B) terminal 5, 6, 7, 8, 4.

  

Is the Inspection result normal?
YES >> GO TO 3.
NO >> Repair or replace damaged parts.
3.CHECK HARNESS BETWEEN TCM AND PNP SWITCH (PART 2)

  

Check continuity between TCM harness connector F16 terminal 1, 2, 3, 4, 11 and ground.

  

Is the Inspection result normal?
YES >> GO TO 4.
NO >> Repair or replace damaged parts.
4.CHECK CVT POSITION

  1. Remove control cable from manual lever. Refer to See: Transmission and Drivetrain\Continuously Variable Transmission/Transaxle\Shift Linkage\Service and Repair\CVT RE0F10A\Exploded View.
  2. Check continuity PNP switch connector terminals. Refer to "Component Inspection (Park/Neutral Position Switch". Is the Inspection result normal?

YES >> Adjust CVT position. Refer to See: Transmission and Drivetrain\Continuously Variable Transmission/Transaxle\Shifter CVT\Adjustments\CVT RE0F10A\CVT Position.
NO >> GO TO 5.
5.DETECT MALFUNCTIONING ITEMS
Check TCM connector pin terminals for damage or loose connection with harness connector.
Is the Inspection result normal?
YES >> Replace TCM. Refer to See: Powertrain Management\Transmission Control Systems\Control Module, CVT\Service and Repair\CVT RE0F10A\Exploded View.
NO >> Repair or replace damaged parts.

Component Inspection (Park/Neutral Position Switch)
1.CHECK PNP SWITCH

  1. Adjust PNP switch position. Refer to See: Transmission and Drivetrain\Continuously Variable Transmission/Transaxle\Shifter CVT\Adjustments\CVT RE0F10A\CVT Position.

  

  1. Check continuity between PNP switch terminals.

  

Is the Inspection result normal?
YES >> Inspection END
NO >> Replace PNP switch. Refer to See: Powertrain Management\Transmission Control Systems\Transmission Position Sensor/Switch, CVT\Service and Repair\Exploded View.